NBS Logo
Home About Products News Links Contact    

 

 
Fast Track Cladding

 

 

 

Iso-Net Cladding System

Method Of Installation:

01. The ISO-NET system is designed for use in conjunction with a durable breathable sheathing board or aluminium honeycomb board system.

02. The aluminium honeycomb board is mechanically fixed to a cladding frame of timber or metal stud, incorporating the required thickness of thermal insulation within the stud section. The back of the honeycomb board is separated from the stud using a thermal packer having vertical grooves for moisture drainage. All joints between honeycomb boards are taped and sealed.

03. A horizontal datum line/level is established at the head and base of each storey level using a laser level. The vertical distance between levels is set to a brick coordinating coursing module to suit the ISO-NET sheets.

04. The specially formulated adhesive is evenly applied to the face of the honeycomb panel, ensuring that all the fixings and panel joints are completely covered.

05. The ISO-NET corners are applied to the reveals, heads and external corners and held in position with bespoke honeycomb anchors.

06. The remainder of the elevation is then infilled using the standard ISO-NET sheets with any non standard lengths being cut to suit.

07. Following the complete covering of the elevation with the ISO-NET sheets, the system is mortared using special pointing mortar applied via either hand or gun pointing application and tooled to form the desired joint profile. The retention anchors must be completely covered by the pointing mortar.

 

Back to top

Iso-Net Iso-Net Iso-Net

 

Product Range
Brickwork/Precast
GIMA Blocks
GIMA Roman Bricks
GENERIX Rainscreen
Terracotta Rainscreen
Fast Track Cladding
Polynorm Doorsets
Promonta
NBS Roofing System
Glazed Products
Stone
Masonry
Hand Moulded Terracotta
Decking and Siding

Further Information:

Typical Details & U Values

Iso-Net Main Page